Greetings,
Recently we configured a new schedule line category with a delivery block in it. When ever this schedule line gets determined for a line, a delivery block gets updated on it. This is fine. But when that material is replaced with another material - Item category and its corresponding schedule line category gets re-determined. Even after re-determination of schedule line category, the delivery block which got updated earlier is not getting removed.
I believe when the schedule line category is changed then the delivery block should be removed automatically as the new schedule line category don't have the block in the configuration.
Attaching the screen shots for reference.
Is there a note to correct this?
Please share your thoughts.
Thanks for your support.
AK